1. Fill in the blanks by choosing the appropriate word/phrase from the choices given below:
[environment, communication, turnkey, noise, compensation, scheduling, intervening, paradigm, PERT, capacitors]
KVAR control can be done by appropriate placement of device.
A project is to be implemented within the constraints of Time, Quality, Cost and
Outlining the time required to complete activities of a project is called
Power utilities should provide LT distribution transformers.
Single point responsibility is ensured in a contract.
network is a planning tool for project management.
Accuracy of the message communicated is affected by
Successful change in an organisation follows three steps Unfreezing, Refreezing.
When new information about an event, object, behaviour and image is integrated and leads to the emergence of a new belief, the change is called change.
is the transfer of meaning and understanding between two parties.
Answer any ten questions.
2. Define Load factor.
3. What is IRR of a project
4. What are the methods for customer satisfaction measurement?
5. What is Franchisee scheme?
6. Define 'Turnkey Contract'.
7. What do you understand by Forward and Backward integration?
8. What demotivates an employee?
9. What are the positive consequences of conflict
10. What problems are encountered in vertical communication?
11. What do you mean by "Degree of Operating Leverage"
12. List different billing methods in power distribution areas.
13. Categorise the changes that occur in an organisation.
Answer any ten questions.
14. Briefly write about communication barriers.
15. What are the best practices in complaint handling?
16. Explain 'Benchmarking'.
17. Suppose your organisation requires restructuring. Which type of structure would you choose and why?
18. Outline the basic issues to be borne in mind by any change implementer while implementing any kind of change in an organisation.
19. Differentiate between Fixed Assets and Current Assets.
20. Define Diversity factor.
21. Mention the benefits of AMR.
22. Differentiate between Preventive maintenance and Corrective maintenance.
23. What preparatory work is required before the implementation of a project Explain with an example.
24. Explain the process of investment evaluation in respect of financial analysis of projects.
[environment, communication, turnkey, noise, compensation, scheduling, intervening, paradigm, PERT, capacitors]
KVAR control can be done by appropriate placement of device.
A project is to be implemented within the constraints of Time, Quality, Cost and
Outlining the time required to complete activities of a project is called
Power utilities should provide LT distribution transformers.
Single point responsibility is ensured in a contract.
network is a planning tool for project management.
Accuracy of the message communicated is affected by
Successful change in an organisation follows three steps Unfreezing, Refreezing.
When new information about an event, object, behaviour and image is integrated and leads to the emergence of a new belief, the change is called change.
is the transfer of meaning and understanding between two parties.
Answer any ten questions.
2. Define Load factor.
3. What is IRR of a project
4. What are the methods for customer satisfaction measurement?
5. What is Franchisee scheme?
6. Define 'Turnkey Contract'.
7. What do you understand by Forward and Backward integration?
8. What demotivates an employee?
9. What are the positive consequences of conflict
10. What problems are encountered in vertical communication?
11. What do you mean by "Degree of Operating Leverage"
12. List different billing methods in power distribution areas.
13. Categorise the changes that occur in an organisation.
Answer any ten questions.
14. Briefly write about communication barriers.
15. What are the best practices in complaint handling?
16. Explain 'Benchmarking'.
17. Suppose your organisation requires restructuring. Which type of structure would you choose and why?
18. Outline the basic issues to be borne in mind by any change implementer while implementing any kind of change in an organisation.
19. Differentiate between Fixed Assets and Current Assets.
20. Define Diversity factor.
21. Mention the benefits of AMR.
22. Differentiate between Preventive maintenance and Corrective maintenance.
23. What preparatory work is required before the implementation of a project Explain with an example.
24. Explain the process of investment evaluation in respect of financial analysis of projects.
Other Question Papers
Departments
- Centre for Corporate Education, Training & Consultancy (CCETC)
- Centre for Corporate Education, Training & Consultancy (CCETC)
- National Centre for Disability Studies (NCDS)
- School of Agriculture (SOA)
- School of Computer and Information Sciences (SOCIS)
- School of Continuing Education (SOCE)
- School of Education (SOE)
- School of Engineering & Technology (SOET)
- School of Extension and Development Studies (SOEDS)
- School of Foreign Languages (SOFL)
- School of Gender Development Studies(SOGDS)
- School of Health Science (SOHS)
- School of Humanities (SOH)
- School of Interdisciplinary and Trans-Disciplinary Studies (SOITDS)
- School of Journalism and New Media Studies (SOJNMS)
- School of Law (SOL)
- School of Management Studies (SOMS)
- School of Performing Arts and Visual Arts (SOPVA)
- School of Performing Arts and Visual Arts(SOPVA)
- School of Sciences (SOS)
- School of Social Sciences (SOSS)
- School of Social Work (SOSW)
- School of Tourism & Hospitality Service Sectoral SOMS (SOTHSM)
- School of Tourism &Hospitality Service Sectoral SOMS (SOTHSSM)
- School of Translation Studies and Training (SOTST)
- School of Vocational Education and Training (SOVET)
- Staff Training & Research in Distance Education (STRIDE)
Subjects
- Energy Managementand itApplication
- Management of Power Distribution
- Power Distribution Sector