1. Answer any six of the following:
Are man-made systems, such as administrative, economic systems, etc. physical systems? Give reasons for your answer. What are the peculiar characteristics of process control systems? Explain the construction and principle of operation of a microwave oven used for cooking. An electric lamp has power of 12 watts, when a potential difference of 100 volts is applied. What is its resistance What is the role of precision control systems in process industry Define inductance and capacitance. Write their S.I. units. Write the power and energy relationship for an inductance and for a capacitance. Consider the domestic temperature controlled electric iron. Draw a block diagram for it. Identify the reference input, error, output signal, error detector and controller. Elevators are used to carry passengers and goods up and down in a multi-storeyed building. Which type of motor is used for this purpose? What motion transformer is used to convert rotation of the motor shaft in to up and down motion of the elevator? Explain Kirchhoff's law for any electrical network. Draw/write various energy conversion systems to obtain electrical energy.

2. Answer any two of the following: A diet for a sick person must contain at least 4000 units of vitamins, 50 units of minerals and 1400 units of calories. Two foods, A and are available at a cost of Rs. 4 and Rs. 3 per unit respectively. If one unit of A contains 200 units of vitamins, 1 unit of minerals and 40 units of calories and one unit of food B contains 100 units of vitamins, 2 units of minerals and 40 units of calories. Find by graphical method, what combination of foods be used to have least cost. A company has 3 factories, B and which supply 4 warehouses situated at R and S. The monthly production capacity of B and C are 120, 80 and 200 tons respectively. The monthly requirements (tons) for the warehouses R and S are 60, 50, 140 and 50 respectively. The transportation cost (Rs per ton) matrix is given below <img src='./qimages/9568-2b.jpg'>

Using vogel's method, determine the optimum transportation distribution of products to the warehouses to minimize total transportation cost.
An automobile dealer wishes to put three repairmen to four different jobs. The repairmen have somewhat different kinds of skills and they exhibit different levels of efficiency from one job to another. The dealer has estimated the number of man-hours that would be required for each job-man combination. This is given in matrix form in the following table:
<img src='./qimages/9568-2c.jpg'>

Find the optimal assignment that will result in minimum man-hours needed.

3. Answer any two of the following: A large service station has a store room from where the service mechanics take the parts for the jobs they work upon. The mechanics wait in the line to get the parts that they need. The store is managed by one attendant who can on an average, attend 7 mechanics per hour. It is observed that on an average the mechanic's average arrival rate at the store room is 5 per hour. Assuming that the pattern of mechanic's arrival is Poisson distributed and the servicing time is exponentially distributed, determine the expected number of mechanics in the system, that is those waiting in line and being serviced by the attendant,

(ii) the expected number of mechanics waiting in the queue,

(iii) the expected time that a mechanic has to spend in the queue, and

(iv) the expected time that a mechanic spends in the system, i.e., waiting in the queue and getting service. Draw a network diagram from the following activities and find critical path and total slack activities <img src='./qimages/9568-3b.jpg'> Answer any four of the following: What are the main objectives of Inventory Control?

(ii) Define Carrying cost and Shortage cost.

(iii) Discuss the difference between PERT and CPM.

(iv) What do you understand by Multiple solution to a linear programming problem? Write Kendall's notations and symbols for a general queuing problem/system.


Departments

  • Centre for Corporate Education, Training & Consultancy (CCETC)
  • Centre for Corporate Education, Training & Consultancy (CCETC)
  • National Centre for Disability Studies (NCDS)
  • School of Agriculture (SOA)
  • School of Computer and Information Sciences (SOCIS)
  • School of Continuing Education (SOCE)
  • School of Education (SOE)
  • School of Engineering & Technology (SOET)
  • School of Extension and Development Studies (SOEDS)
  • School of Foreign Languages (SOFL)
  • School of Gender Development Studies(SOGDS)
  • School of Health Science (SOHS)
  • School of Humanities (SOH)
  • School of Interdisciplinary and Trans-Disciplinary Studies (SOITDS)
  • School of Journalism and New Media Studies (SOJNMS)
  • School of Law (SOL)
  • School of Management Studies (SOMS)
  • School of Performing Arts and Visual Arts (SOPVA)
  • School of Performing Arts and Visual Arts(SOPVA)
  • School of Sciences (SOS)
  • School of Social Sciences (SOSS)
  • School of Social Work (SOSW)
  • School of Tourism & Hospitality Service Sectoral SOMS (SOTHSM)
  • School of Tourism &Hospitality Service Sectoral SOMS (SOTHSSM)
  • School of Translation Studies and Training (SOTST)
  • School of Vocational Education and Training (SOVET)
  • Staff Training & Research in Distance Education (STRIDE)

Subjects

  • Agricultural Legislation and Management
  • Building Architecture
  • Building Services
  • Chemistry
  • Computer Applications
  • Computer Programming and Numerical Analysis
  • Concrete Technology & Construction Techniques
  • Construction Management-I
  • Construction Management-II
  • Construction Works Supervision
  • Design Detailing
  • Earth & Its Environment
  • Elementary Hydrology
  • Engineering Materials
  • Engineering Mechanics
  • Engineering Thermodynamics
  • Flow in Open Channel
  • Foundation Engineering
  • Ground Water Development
  • Hydraulic Structures
  • Hydraulic Structures-I
  • Hydraulic Structures-II
  • Hydrology
  • Inventory and Stores Management
  • Irrigation Engineering
  • Materials Science
  • Mathematics  III
  • Mathematics- I
  • Mathematics- II
  • Mechanical Equipmentsin Construction
  • Mechanics of Fluids
  • Open Channel Flow
  • Operation and Maintenance of Construction Equipment
  • Physics
  • Planning Construction of Buildings
  • Pollutants and Water Supply
  • Principles of Electrical Science
  • Principles of Engineering Management and Economics
  • Quantity Surveying & Valuation
  • Repair and Maintenance of Buildings
  • Soil Conservation and Agronomy
  • Soil Mechanics
  • Soil Science
  • Strength of Materials
  • Structural Analysis
  • Structural Design- |
  • Structural Design- II
  • System Methods
  • Technical Writing
  • Testing for Quality Control
  • Transportation &Traffic Engineering
  • Waste Water Treatment
  • Water Resources Planning