1. Mention True or False for the statements given below:
A Project Manager has maximum authority in a matrix organization structure.
When time is the essence of contract, full payment by the employer is delayed.
is the extra time available to perform an activity without affecting the project completion time.
PERT is used for scheduling product development projects.
Critical path is the longest path in the project network.
Resource levelling exercise uses activity floats to reschedule activities, without delaying project completion.
Direct costs are nothing but all the project overheads.
2. What are the objectives and principles of planning? List the steps involved in planning.
3. What are the methods of scheduling Explain with the help of a suitable example, the method of preparing a bar chart.
What do you mean by PERT? What is its significance? Explain briefly.
What are the time estimates used in PERT? Explain their significance.
5. Explain the importance of organisation in construction activities. Discuss the advantages and disadvantages of line organisation.
6. What are the important points to be observed during inspection of water supply and sanitary lines
7. Explain the use of documentation and quality control circles in construction quality management.
8. Write short notes on any two of the following:
Direct and Indirect Costs
Delegation of Authority
Quality Control for Electrical Services
A Project Manager has maximum authority in a matrix organization structure.
When time is the essence of contract, full payment by the employer is delayed.
is the extra time available to perform an activity without affecting the project completion time.
PERT is used for scheduling product development projects.
Critical path is the longest path in the project network.
Resource levelling exercise uses activity floats to reschedule activities, without delaying project completion.
Direct costs are nothing but all the project overheads.
2. What are the objectives and principles of planning? List the steps involved in planning.
3. What are the methods of scheduling Explain with the help of a suitable example, the method of preparing a bar chart.
What do you mean by PERT? What is its significance? Explain briefly.
What are the time estimates used in PERT? Explain their significance.
5. Explain the importance of organisation in construction activities. Discuss the advantages and disadvantages of line organisation.
6. What are the important points to be observed during inspection of water supply and sanitary lines
7. Explain the use of documentation and quality control circles in construction quality management.
8. Write short notes on any two of the following:
Direct and Indirect Costs
Delegation of Authority
Quality Control for Electrical Services
Other Question Papers
Departments
- Centre for Corporate Education, Training & Consultancy (CCETC)
- Centre for Corporate Education, Training & Consultancy (CCETC)
- National Centre for Disability Studies (NCDS)
- School of Agriculture (SOA)
- School of Computer and Information Sciences (SOCIS)
- School of Continuing Education (SOCE)
- School of Education (SOE)
- School of Engineering & Technology (SOET)
- School of Extension and Development Studies (SOEDS)
- School of Foreign Languages (SOFL)
- School of Gender Development Studies(SOGDS)
- School of Health Science (SOHS)
- School of Humanities (SOH)
- School of Interdisciplinary and Trans-Disciplinary Studies (SOITDS)
- School of Journalism and New Media Studies (SOJNMS)
- School of Law (SOL)
- School of Management Studies (SOMS)
- School of Performing Arts and Visual Arts (SOPVA)
- School of Performing Arts and Visual Arts(SOPVA)
- School of Sciences (SOS)
- School of Social Sciences (SOSS)
- School of Social Work (SOSW)
- School of Tourism & Hospitality Service Sectoral SOMS (SOTHSM)
- School of Tourism &Hospitality Service Sectoral SOMS (SOTHSSM)
- School of Translation Studies and Training (SOTST)
- School of Vocational Education and Training (SOVET)
- Staff Training & Research in Distance Education (STRIDE)
Subjects
- Advance Surveying
- Bachelor Of Technology (Ce)
- Building Technology - I
- Civil Engineering
- Construction Management
- Elements Of Engineering Science
- Engineering Geology
- Environmental Engineering-I
- Environmental Engineering-Ii
- Estimation And ConstructionManagement
- Geoinformatics
- Geotechnical Engineering - Ii
- Mathematics-Hi
- Quantity Surveying And Costing
- Soil Mechanics and Foundation Engineering
- Structural Analysis - Ii
- Structural Analysis - Iii
- S t r u c t u r a l A n a l y s i s I
- Structural Design And Drawing - I
- Structural Design And Drawing - Ii
- Surveying
- Transportation Engg. Ii
- Transportation Engineering - I
- Water Resources Engineering